Shade Structure Steelwork Goes Up

16Dec: Steelwork for the shade structure has been assembled/installed on site.

An early start for Norm Barnes, on site at the club at 7am to supervise the installation of the steelwork for our shade structure that will provide much needed shade for:

  1. Our patrolling members.
  2. Nippers.
  3. Bar patrons.

Once completed this will be a great addition to the club. Funding was via the NSW Government grants system specifically for surf clubs.

This has been a long time in the making, the DA going in 2 years ago. Thanks to Norm for running with it to completion(nearly). The final stage is the shade material installation, which will happen Monday 13Jan25.

So more installation pics here.

Article By:

Birubi Point SLSC VP

Dec 16, 2024

More To Read About

SLSNSW State Conference 2026

On Saturday 25th and Sunday 26th July, Rohan Fisher(President), Greg Williams(Director of Lifesaving), Callum Mercer(Director of Youth), Steve Fogwill(Director of Education) represented the club at SLSNSW 2026 State Conference held in Sydney.
Learn More →